top of page

Create Your First Project

Start adding your projects to your portfolio. Click on "Manage Projects" to get started

• New Build Garage & Workshop

Project Type

New Build

Date

April 2023

Andreas

Isle of Man

August 2023

• New 8m x 7m cavity block garage construction
• Full water, electric, internet and toilet services installed
• Hand-cut insulated roof
• Six skylights for natural lighting
• Anthracite fascias and soffits
• K Rend silicone render system
• 5m insulated electric roller door
• PVC rear entrance door
• High-end workshop electrical specification
• Seamless resin floor system
• Built for long-term durability and modern use

This project involved the construction of a completely new 8m x 7m cavity block garage, built to a high specification and fully equipped for a modern workshop setup. The structure was designed with long-term durability and performance in mind, incorporating all key utilities from the outset, including water, electrical supply, internet connection and a toilet installation.

A hand-cut insulated roof was formed and finished with anthracite fascias and soffits, along with six overhead skylights to maximise natural light throughout the space. The exterior was completed using a full K Rend silicone render system for a clean, weather-resistant and low-maintenance finish.

The garage features a 5-metre insulated electric roller door to provide secure vehicle access, complemented by a high-quality PVC entrance door at the rear. Internally, the building was fully wired and specified for a high-end workshop environment, allowing for future equipment, machinery and storage systems.

To complete the space, a seamless resin floor system was installed, providing a durable, chemical-resistant and easy-clean finish suitable for both domestic and professional use.

The final result is a premium, fully serviced garage/workshop built from the ground up to a modern standard, combining structural integrity with practical functionality.

bottom of page